Crosstown

Bermondsey Road

October 162019

CONCRETE POUR WEST OF SLOANE ON EGLINTON AVENUE EAST

CONCRETE POUR WEST OF SLOANE ON EGLINTON AVENUE EAST

WHAT WORK IS TAKING PLACE? Read more »

October 102019

Overnight Line Painting on Eglinton Avenue East Between Swift Drive and Sloane Avenue

Overnight Line Painting on Eglinton Avenue East Between Swift Drive and Sloane Avenue

WHAT WORK IS TAKING PLACE? Read more »

October 092019

GUIDEWAY CONSTRUCTION ENDS AT CREDIT UNION-SWIFT

 

GUIDEWAY CONSTRUCTION ENDS AT CREDIT UNION-SWIFT

WHAT WORK IS TAKING PLACE? Read more »

October 042019

GUIDEWAY CONSTRUCTION BETWEEN SLOANE AVENUE AND JONESVILLE CRESCENT

WHAT WORK IS TAKING PLACE?

Guideway construction will commence east of the future Sloane stop as early as October 14, 2019. Traffic will remain in this configuration (depicted below) for approximately six (6) months. Construction at the Wilson Brook Culvert will also continue. Crews are building a temporary storm drain line, as well as excavating and replacing the storm water culvert under Eglinton Ave East. The culvert work is located on the north side of Eglinton Avenue East between Sloane Avenue and Jonesville Crescent.

  Read more »

October 032019

Temporary Driveway Closure at 1700, 1720 and 1730 Eglinton Avenue East

Temporary Driveway Closure at 1700, 1720 and 1730 Eglinton Avenue East Read more »

Categories:
September 302019

TEMPORARY LANE REDUCTIONS ON EGLINTON AVENUE EAST BETWEEN SWIFT DRIVE AND SLOANE AVENUE

TEMPORARY LANE REDUCTIONS ON EGLINTON AVENUE EAST BETWEEN SWIFT DRIVE AND SLOANE AVENUE  

WHAT WORK IS TAKING PLACE? Read more »

September 302019

Sloane Stop Construction on Eglinton Avenue East

 

Sloane Stop Construction on Eglinton Avenue East Read more »

Or, let us help you Experience Eglinton. Choose a category to explore the neighbourhood:

Syndicate content