Between May 4 to May 11, 2017 crews will relocate and upgrade existing overhead hydro utilities at the Eglinton Avenue and Black Creek Drive in preparation for the the West Portal and Guideway, where the light rail vehicles will travel on bridged tracks above Black Creek Drive, and enter and exit the underground portion of the Crosstown. Read more »
Thank you for attending our Mount Dennis & Eglinton Maintenance and Storage Facility Open House on March 29, 2017.
For those of you who missed it, the presentation is here:
Continuing Demolition of Retaining Wall – Photography Drive and Keelesdale Drive
What Work is Taking Place? Read more »
Information as of September 9, 2016 |
Construction of the Eglinton Crosstown LRT line, including 15 underground stations, is underway. Since the end of school, many construction sites have been set up for station construction and the set-up of some major intersections along Eglinton Avenue has been changed.
Pedestrian Information Read more »
Thank you for attending our Mount Dennis station open house on May 26, 2016.
For those of you who missed it, the presentation is here:
As you may know, the Eglinton Crosstown includes a 10-kilometre underground portion, between Keele Street and Laird Drive. For the tunnelled portion, locomotives run along interim track and transport materials and haul spoils in and out of the tunnels to the extraction shafts. Tunnel boring machines (TBMs) and muck removal operations run around the clock - 24 hours a day. Read more »
Experience Eglinton by street: