Crosstown

Brentcliffe Road

January 062022

Watermain Connection Work – Eglinton Avenue East and Brentcliffe Road

Watermain Connection Work –

Eglinton Avenue East and Brentcliffe Road


Read more »

August 202021

Noise Barrier Wall and Soil Nail Wall Removal

Rendering

 

As early as Fall 2021, crews will begin removing the temporary noise barrier wall and soil nail wall located on the south side of Eglinton Avenue East, east of Brentcliffe Rd. The temporary walls were erected in 2014 to facilitate the construction of the east portal. Removal of the walls will take approximately two (2) months. 

What to Expect Read more »

June 202021

OCS Cable Installations on Eglinton Avenue East between Laird Drive and Leslie Street

 

OCS Cable Installations on Eglinton Avenue East between Laird Drive and Leslie Street

What Work is Taking Place?

May 132021

Light Rail Vehicle Delivery and Testing between Laird Dr. and Kennedy Rd.

 

East Testing and Commissioning Map

Starting May 25, six (6) Light Rail Vehicles (LRVs) will be moved from the Eglinton Maintenance and Storage Facility (EMSF) to the LRT tracks (guideway) at Rosemount Dr. via truck transport. The LRVs will be delivered one at a time, on May 25, 26, 27, 31 and June 1 and 2. 

  Read more »

May 062021

Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - May 6, 2021

Construction updates for stations and stops including: Brentcliffe Portal, Sunnybrook Park, Science Centre, Aga Khan, Wynford, Sloane and O'Connor.

Read more »

Or, let us help you Experience Eglinton. Choose a category to explore the neighbourhood:

Syndicate content