March 27 2020

Stormline Inspection and Fire Hydrant Testing at Emergency Exit Building 3 (EEB3)

 

STORMLINE INSPECTION AND FIRE HYDRANT TESTING AT EMERGENCY EXIT 3

(Eglinton Avenue East and Donlea Drive) Read more »

March 27 2020

Sidewalk and Partial Driveway Closure at 2239 and 2243 Eglinton Avenue East - Extended until July 31

 

Last update: January 9, 2020

Updated on March 27, 2020

 

What Work is Taking Place

As part of the ongoing works to build the LRT system along Eglinton Avenue East, crews continue work with stage two at Massey Creek. There will be a partial driveway closure to the driveway access for 2239 and 2243 Eglinton Avenue East. The partial driveway restriction will be extended through July 31 in order to carry out the remaining work safely. Access to the properties will be maintained at all times. Read more »

March 26 2020

Shelter Installation at Westbound Pharmacy Stop April 7, 2020 – April 10, 2020

What Work is Taking Place

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will install three permanent shelters for the westbound stop at Pharmacy Avenue and Eglinton Avenue East. The permanent shelters will be installed as early as April 7, 2020 and assembly will last for one (1) week. Read more »

March 26 2020

Upcoming TTC Line 1 Closure for Berwick Portal Construction - Sunday March 29, 2020

 

What Work is Taking Place?

Since 2019, a series of closures of TTC’s Line 1 subway have taken place to accommodate construction a facility service building for Line 1 at Berwick Avenue and Yonge Street.  On Sunday March 29, 2020, TTC’s Line 1 subway will be closed between St. Clair and Lawrence stations while crews perform hydro support beam installation and reinforcement at the track and platform level.  Berwick Avenue will remain open while this work takes place.


Read more »

March 26 2020

Cedarvale & Forest Hill Construction Liaison Committee Meeting - Mar 25, 2020

The construction liaison committee meeting of Cedarvale & Forest Hill was held on March 25, 2020. You can view the presentation here:

March 24 2020

Closure on Rosemount Drive North of Eglinton Avenue East - Extended Until June 1, 2020

 

What Work is Taking Place

As part of the ongoing works to replace the existing culvert at Massey Creek, the current traffic configuration at Rosemount Drive and Eglinton Avenue East will be extended until June 1, 2020. Rosemount Drive will remain closed north of Eglinton Avenue East and north-south through traffic will be prohibited for the duration of the work.

Work continues at the east wing-wall of the creek and includes excavation, concrete works, removal of form work and backfilling.  Read more »

March 24 2020

Concrete Pour at Avenue Station Thursday, March 26, 2020

What Work is Taking Place? 

On Thursday, March 26, 2020, crews will perform a concrete pour at the main entrance of Avenue Station. The concrete will form one of the permanent station structures underground. To safely carry out the works, westbound traffic on Eglinton Avenue West will be reduced to one lane at the Main Entrance. The pour will begin at 6:00 a.m. and take approximately twelve (12) hours to complete.  After the pour is complete, the lane will re-open. Read more »