Crosstown

What's New?

Syndicate content
 
April 22 2019
April 18 2019

Guideway Construction on Eglinton Avenue East At Celestica Bridge

WHAT WORK IS TAKING PLACE?

Lanes will be realigned to accommodate guideway construction on Eglinton Avenue East at the Celestica Bridge. Traffic is expected to change to the configuration depicted below as early as April 23, 2019 and continue for approximately three (3) months. 

All works are in support of the construction of the Crosstown LRT tracks and guideway (dedicated transit lane) in the centre of Eglinton Avenue East.

 

TIMING  Read more »

April 18 2019

Overnight Concrete Pour at Mount Pleasant Station Wednesday April 24, 2019

On Wednesday April 24, 2019, at 11:00 p.m., crews will perform a large concrete pour in the southwest work zone at Mt Pleasant Road and Eglinton Avenue East.  The concrete will form part of the roof of Mount Pleasant Station. Continuity is critical to the integrity of the pour, therefore the pour will be conducted overnight when traffic is lighter, making it easier for trucks to access the site.

Details

  • Wednesday April 24, 2019 beginning at 11:00 p.m. for approximately eight (8) hours

April 18 2019

Construction Notice:TIMES ROAD CLOSURE April 29th, 2019

WHAT WORK IS TAKING PLACE?

Mining works at Oakwood Station continue to progress. During upcoming backfill removal, crews require additional space on Times Road to accommodate truck staging for approximately two (2) weeks. Read more »

April 18 2019

Updated: Concrete Pour of Guideway - East of Warden Avenue - April 22 & April 24, 2019

Originally Posted: April 15, 2019

Updated: April 18, 2019 

What Work is Taking Place?

As part of continued support of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting a concrete pour of the guideway in the center of Eglinton Avenue East, just east of Warden Avenue and Thermos/Sinnott Road. Read more »

April 18 2019

Updated: Construction Notice - Sidewalk Closure for Civil Road Work between Pharmacy Avenue and Hakimi Avenue

Originally Posted: April 15, 2019 

Updated: April 18, 2019 

What Work is Taking Place? Read more »

April 18 2019

Telecommunication Relocations at Victoria Park Avenue and Eglinton Avenue East

WHAT WORK IS TAKING PLACE?

In support of construction of the future Eglinton Crosstown LRT stops and guideway (dedicated transit lane), crews will be relocating telecommunications infrastructure on Victoria Park Avenue at Eglinton Avenue East. The work will be completed in two (2) stages (depicted below), beginning as early as April 22, 2019 and continue for approximately one (1) week.  

 

TIMING  Read more »

April 18 2019

Overnight Hydro Utility Work at Mount Pleasant Station Week of Monday April 22, 2019

What Work is Taking Place?

Starting Monday April 22, crews will work overnight to complete hydro utility work in the southwest work zone at Mt Pleasant Road and Eglinton Avenue East.  This work will be carried out on a 24 hour basis for approximately five (5) days in preparing for the upcoming station roof concrete pour.  Crews will endeavour to minimize disruption as much as possible. Read more »

April 17 2019

Update: Cross Passage Dewatering System between Lillian Street and Redpath Avenue

WHAT WORK IS TAKING PLACE

The dewatering system at Cross Passage 10 site between Lillian Street and Redpath Avenue is now recommissioned and will operate on a 24 hour basis. Periodic maintenance will be required.

 

 

 

TRAFFIC, TTC AND PEDESTRIAN IMPACTS Read more »

April 16 2019

Construction Notice: Concrete Pour at Fairbank Station - April 18, 2019

What Work is Taking Place?

On Thursday April 18, crews will perform a concrete pour at the Main Entrance area of Fairbank Station. The concrete will form part of the Main Entrance walls.  A concrete pump will be placed on Vaughan Road behind the Main Entrance site, and concrete trucks will deliver concrete to the site.  Dufferin Street and Eglinton Avenue West will remain open while work takes place. Read more »

Or, let us help you Experience Eglinton. Choose a category to explore the neighbourhood: