Crosstown

What's New?

Syndicate content
 
September 20 2019

CANCELLATION NOTICE: Berwick Avenue Road Closures for TTC Line 1 Facility Service Building Construction September 20 – 23, 2019

Please be advised that the Berwick Avenue closure scheduled for Friday September 20, 2019 has been cancelled and has been rescheduled for one weekday between September 30 and October 11, 2019.  A subsequent notice will be issued once the reschedule date has been confirmed

 

Road Closure Details

The Berwick Ave closure scheduled for Friday September 20 – Monday September 23, 2019 has been cancelled.

 

Berwick Ave will be closed between Duplex Ave and Yonge St: Read more »

September 18 2019

Partial Driveway Closure - 2300 Eglinton Avenue East

What Work is Taking Place?

As part of the ongoing works to build the LRT system along Eglinton Avenue East, crews will continue work with stage 2 at Massey Creek. As early as September 20th the eastern driveway at 2300 Eglinton Avenue property will be closed for four (4) months. The closure is required to carry out the construction works in a safe and prompt manner. 

During the closure, vehicles will be directed to use the accessible western driveway along Eglinton Avenue. This can be seen in the figure below: Read more »

September 16 2019

DECK MAT REPAIR - LEASIDE STATION

Six (6) additional days are required for deck mat repair at Leaside Station. On September 19/20, September 26/27 and October 3/4 between 7:00am - 7:00pm there will be lane and turn restrictions on Eglinton Avenue East at Bayview Avenue to complete decking repairs.

TRAFFIC AND PEDESTRIAN IMPACTS Read more »

September 13 2019

Emergency Weekend and Overnight Bell Work at Mount Pleasant Station Friday, September 13, 2019

What Work is Taking Place?

Starting Friday September 13, crews will work through the weekend and overnight to perform emergency Bell utility work on the south side of Eglinton Ave E. Construction activities include excavation and cable repair work. This work requires the use of excavators, hydro-vacuum trucks and generators, as well as site lighting. This work will take place within the existing work zone. Crews will endeavour to minimize disruption as much as possible. Read more »

September 13 2019

Temporary Traffic Change for Wet Utility Work at Chaplin Station September 16 – 24, 2019

On September 16, a temporary change will be implemented on Eglinton Avenue, east of Chaplin Crescent to accommodate wet utility work for Chaplin Station.  The northeast work zone will be extended further east and south of Latimer Avenue.  Traffic on Eglinton Ave will be shifted south.  No changes to pedestrian routes are anticipated.  Once the work is complete, the work zone will return to the current configuration.

Upcoming Traffic and Pedestrian Configuration Read more »

September 12 2019

Or, let us help you Experience Eglinton. Choose a category to explore the neighbourhood: