What Work is Taking Place?
On Friday, June 15th 2019, crews at Caledonia will perform a concrete pour. Eglinton Ave W will remain reduced to one (1) lane travelling westbound from Blackthorne Ave to the entry of the Westside Mall.
Hours of Work
- Friday June 15, 2019 from 9:00am to 7:00pm.
- In the event of inclement weather, this work will be rescheduled for another date.
Construction Staging
What to Expect
- Noise from concrete trucks and equipment can be expected.
- Motorists can expect delays when travelling through the intersection.
- One westbound lane on Eglinton Ave may be occupied while this work takes place.
- There will be no impacts to pedestrian routes or TTC stops.
Travelling Smart during Construction
- Sign up for e-mail updates at http://www.thecrosstown.ca/sign-up or download the aCrosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.
- Travel delays are expected with construction. Please allow extra time for your journey.
- Traffic will be extra heavy at peak periods during Eglinton Crosstown LRT construction.
- Download the free ‘aCrosstown’ traffic app to get real-time traffic and transit information for Eglinton Avenue.
Disponible en Français.