Since fall 2019, crews have conducted several closures of the pedestrian path around the Forest Hill Station Secondary Entrance site to carry out concrete pours. The next concrete pour is scheduled for Monday, March 16, 2020. The concrete will form the walls of the Secondary Entrance structure. The Hilltop Road-Bathurst Street laneway and pedestrian path around the Secondary Entrance will be closed while the pour takes place. Once the pour is complete, the pedestrian path and laneway will re-open.
Hours of Work
Work Area Map
What to Expect
Pedestrian Details
Traffic Details
Travelling Smart during Construction
Travel delays are expected with the Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10 a.m. and 3 p.m.
Stay Informed
Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the Crosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.
Disponible en français.
Thank you for your continued patience as we work to build this important project.
Please support your local businesses during construction.