Original Post: April 23, 2021
Updated: April 28, 2021
Overnight OCS Cable Installations on Eglinton Avenue East between Don Mills Road and Sloane Avenue
WHAT WORK IS TAKING PLACE?
Crews will be installing OCS (Overhead Catenary System) cables along Eglinton Avenue East between Don Mills Road (Science Centre Station) and Sloane Avenue. Overhead catenary is the system installed overtop of the rails of a light rail system, to provide operational power to the LRVs (Light Rail Vehicles). Installation will take place from Sunday April 25 – May 2, 2021 between the hours of 4:00 p.m. and 1:00 a.m. Crews will operate above the track. No significant traffic impacts are expected, while this work takes place.
WHAT TO EXPECT
Cables will be installed overhead using a high rail vehicle. Minimal noise is expected while this work takes place. Site lighting will be required.
HOURS OF WORK
TRAFFIC AND PEDESTRIAN DETAILS
TTC DETAILS
Experience Eglinton by street: