New Traffic Configuration at Rosemount Drive and Eglinton Avenue East - January 2, 2020

What Work is Taking Place

As part of the ongoing works to replace the existing culvert at Massey Creek, a new traffic configuration will be implemented at Rosemount Drive and Eglinton Avenue East as early as Thursday January 2, 2020. Rosemount Drive will be closed north of Eglinton Avenue East and north-south through traffic will be prohibited for the duration of the work.

Work includes excavation, concrete works, shoring installation and backfilling.  Read more »

November 272019

Pharmacy to Kennedy Construction Liaison Committee Meeting - Nov 2019

The construction liaison committee meeting of Pharmacy to Kennedy was held on November 26, 2019. You can see the presentation here:


Download the presentation

November 202019

New Traffic Configuration at Rosemount Drive Road and Eglinton Avenue East

 

What Work is Taking Place

As early as Saturday November 30, 2019, a new traffic configuration will be implemented at Rosemount Drive and Eglinton Avenue East to facilitate construction of the future surface stops and guideway. Westbound traffic will be shifted north of the work zone. Left turns will remain prohibited at the Rosemount Drive Intersection. There will be no north-south through traffic on Rosemount Drive. 

The new traffic configuration will be implemented as early as November 30, 2019

  Read more »

November 152019

Mid-block Guideway and Stop Construction from Victoria Park Avenue to Ionview Road

 

What Work is Taking Place

As part of construction of the future surface alignment for the Eglinton Crosstown LRT, crews will be conducting mid-block guideway and stop construction between Victoria Park Avenue and Ionview Road, for approximately eight (8) months through spring 2020. 

Guideway and stop construction includes: cutting and removal of asphalt, excavation, installation of subgrade materials, duct banks installation, track drainage, track slab and stop construction. Read more »

November 082019

Mid-Block Guideway Work at the East of Birchmount Road

 

What Work is Taking Place?

On Sunday November 3, 2019, Rosemount Drive will be closed north of Eglinton Avenue East for approximately six (6) weeks to facilitate guideway construction for the future Eglinton Crosstown LRT surface stops.  Guideway construction includes, cutting and removal of asphalt, excavation, installation of subgrade materials, duct banks installation and track drainage, track slab and stops. Read more »

October 252019

Eastern Works Open House

Thank you for attending the Easterm Works Open House on October 24, 2019. For those of you who missed it, the presentation is here:

 

 

October 172019

Upcoming Driveway Closures between Birchmount Road and Rosemount Drive

Starting October 23, 2019, a series of temporary driveway closures will be in effect between Birchmount Road and Rosemount Drive to facilitate pavement reconstruction and road widening of Eglinton Avenue East, as part of the construction of Birchmount Stop. Eglinton-facing driveways at the following locations will be closed for approximately three (3) weeks while the work takes place:

835 Birchmount Road Read more »

October 172019

UPDATED: Guideway Excavation at Rosemount Drive Intersection

Original Post: October 10, 2019

UPDATED: October 17, 2019

 

What Work is Taking Place?

As part of the ongoing works at intersections along Eglinton Avenue East in support of the future surface stops, crews will be conducting guideway excavation at the Rosemount Drive intersection.  Read more »

October 082019

Guideway Excavation from Birchmount Road to Rosemount Drive

 

What Work is Taking Place?

As part of the ongoing pavement reconstruction works along Eglinton Avenue East in support of construction of the future surface stops, crews will continue with guideway excavation from Birchmount Road to Rosemount Drive.

As early as October 9th, 2019 the construction zone will shift to the center of Eglinton Avenue East between Birchmount Road to Rosemount Drive and be in place for approximately four (4) weeks.  Read more »